Sunday, 12 May 2013

Toile Diary Update

This week I started manufacturing my real final garment in the right fabric! (exciting stuff) . Here's where I got up to...
                                                            Cutting the Fabric out.

Putting the diagonal pipping in.


Top stitching  along the piping.

I had to stop manufacturing on the skirt I had not got the zip for the back of the skirt with me. As the zip was the next step of manufacturing.
 Cutting the fabric and wire out for the shoulders.
 Bagging the fabric out and placing the wire inside the fabric and wadding 
 Hand stitch the other side seam 
 Bias Bind the neck line 

No comments:

Post a Comment